Skip to content
TenderAtlas
69 days left820963-2026

Montenegro – Railway construction works – Rehabilitation of 11 Steel Bridges on the “Vrbnica – Bar” railway line in Montenegro

Railway Infrastructure of Montenegro JSC - Podgorica (RIoM) / Željeznička Infrastruktura Crne Gore AD - Podgorica (ŽICG)

Open official notice ↗

Notice record

Buyer
Railway Infrastructure of Montenegro JSC - Podgorica (RIoM) / Željeznička Infrastruktura Crne Gore AD - Podgorica (ŽICG)
Country
MNE
Published
26 Nov 2026
Deadline
2 Feb 2027 (tenders, UTC+01:00; Earliest date across disclosed lots)
Estimated value
€28,000,000
Procedure
open
Notice type
cn-standard

Description (from the publisher)

Rehabilitation of eleven steel railway bridges on the Vrbnica – Bar railway line in Montenegro, carried out while the line remains in commercial operation; work that needs the track is done within the daily line closures set out in the Tender Document. The Works are divided into two Lots (Lot#1, nine bridges; Lot#2, two bridges), and a separate contract is signed for each Lot. Each Tender shall cover both Lots, and both contracts will be awarded to the same Tenderer. The contracts are financed by a loan of the European Investment Bank and by investment grants of the Western Balkans Investment Framework (WBIF), and each is governed by the FIDIC Conditions of Contract for Construction (Red Book), First Edition 1999, as amended by the Particular Conditions of Contract.

Document manifest

Publisher-disclosed links. Files are not mirrored; access requirements and integrity remain controlled by the publisher.

Responding to an EU (TED) tender

General procedure for this publisher. The official tender documents always take precedence.

  1. Open the official notice and find the address of the procurement documents. TED publishes the notice; the documents and the submission portal belong to the buyer.
  2. Register on the e-procurement platform named in the notice. Most EU buyers accept electronic submissions only.
  3. Prepare the European Single Procurement Document (ESPD) where the buyer requests it, plus the evidence it refers to (exclusion grounds, financial standing, technical capacity).
  4. Check the lot structure, the time limit for receipt of tenders and the language requirements before you start writing.
  5. Send clarification questions through the buyer's platform before its question deadline; answers are usually shared with every bidder.